H100 rental in Europe
The workhorse of current AI infrastructure and the most widely listed data-centre GPU in Europe, with the deepest reserved and on-demand supply.
NVIDIA H100 specifications
- Memory
- 80 GB HBM3
- Memory bandwidth
- 3.35 TB/s
- Scale-up interconnect
- NVLink 900 GB/s
- Max power
- Up to 700 W
Per GPU, SXM (HGX board). Source: NVIDIA product page, checked 18 November 2026.
Best fit
- Training and fine-tuning on multi-node clusters
- High-throughput inference for production APIs
- Research workloads that need mature CUDA tooling
H100 configurations
NVIDIA sells the H100 in 3 configurations. Choose one in the quote form, or leave it open and providers state what they offer.
- SXM (HGX board), 80 GB80 GB, 3.35 TB/s, NVLink 900 GB/s, up to 700 WGet quotes for this configuration
- PCIe card, 80 GB80 GB HBM2e, 2 TB/s, PCIe Gen5 x16, 350 WGet quotes for this configuration
- NVL (PCIe card with NVLink bridge), 94 GB94 GB, 3.9 TB/s, NVLink bridge 600 GB/s, 350–400 WGet quotes for this configuration
Source: NVIDIA H100 product page · NVIDIA H100 PCIe product brief (PB-11133), checked 18 November 2026.
Typical EU price for H100
On-demand list prices at named EU or EEA sites: €2.34 to €4.26 per GPU-hour across 6 providers, lowest row per provider, converted to EUR where listed in USD.
| Provider | Product | Site | EUR / GPU-hr |
|---|---|---|---|
| Taiga Cloud | 8x H100 SXM | Sines, Portugal; Boden, Sweden; Kristiansand, Norway | €2.34 |
| OVHcloud | h100-380 (1x H100) | Gravelines, France (GRA9, GRA11) | €2.80 |
| Scaleway | H100-1-80G (PCIe) | Paris, France (PAR-2) | €2.87 |
| Crusoe | H100 80GB HGX | Iceland (eu-iceland1-a) | €3.50 |
| Nebius | HGX H100 | Finland (eu-north1) | €4.04 |
| Verda | H100 SXM5 80GB | Helsinki, Finland (FIN-01 to FIN-03) | €4.26 |
Public list prices, not quotes. Sources: Taiga Cloud public price list (USD), with sites from the Taiga Cloud home page, accessed 29 October 2026; OVHcloud Public Cloud price list (EUR), accessed 29 October 2026; Scaleway GPU Instances price list (EUR), zone PAR-2 selected, accessed 29 October 2026; Crusoe Cloud public price list (USD), with regions from Crusoe documentation, accessed 29 October 2026; Nebius public price list (USD), with region availability from Nebius documentation, accessed 29 October 2026; Verda public price list (EUR), with locations from Verda documentation, accessed 29 October 2026. Method: European GPU price report.
Third-party price bands
| GPU | Type | Source | USD / GPU-hr | As of |
|---|---|---|---|---|
| H100 | Reserved, directory listings | Compute Exchange GPU directory | $1.10–1.80 | 6 October 2026 |
| H100 | Reserved, full observed range | Compute Exchange, March 2026 data | $1.07–10.14 | March 2026 |
| H100 | Reserved, marketplace median | Compute Exchange, March 2026 data | $1.70 | March 2026 |
| H100 | Reserved, neocloud median | Compute Exchange, March 2026 data | $2.31 | March 2026 |
| H100 | Reserved, hyperscaler median | Compute Exchange, March 2026 data | $6.11 | March 2026 |
| H100 | On-demand, EU regions (13 providers) | GPU Finder | from $1.30 | 6 October 2026 |
| H100 | H100 SXM rental index (OCPI) | Ornn OCPI | $2.52 | 5 October 2026 |
Indicative third-party figures in USD. Some bands are global rather than EU-only; the Type column says which. Quotes you receive are in EUR and come from providers directly.
Where H100 is offered in Europe
Public provider pages we checked, not a list of the providers who quote through Kraftcompute.
- Nebius VM types and regions · HGX H100 in eu-north1 (Finland); price on nebius.com/prices. (checked 18 November 2026)
- OVHcloud Public Cloud prices · h100-380 to h100-1520 (1 to 4 GPUs, 80 GB HBM2e, form factor not stated), Gravelines, France. (checked 18 November 2026)
- Crusoe virtual machine types · 8x H100 SXM5 in eu-iceland1-a (Iceland, EEA). (checked 18 November 2026)
What drives an H100 quote
The same GPU can be priced very differently. These are the inputs that move the price per GPU-hour, and they're the fields in our quote form:
- Term and commitment. On-demand or reserved, and for how long.
- Cluster size and interconnect. GPU count, and InfiniBand or RoCE between nodes.
- Location and residency. EU-only, a named country, or EU-headquartered providers.
- Start date, storage and egress. What's included around the GPUs, and when you need them.
Other GPUs: compare every GPU we quote · How pricing works in detail: What GPU cloud really costs · GPU as a service vs reserved capacity · European GPU price report
H100 rental: questions
How much does H100 rental cost?
There's no single price. Public third-party figures: reserved listings at $1.10–1.80 per GPU-hour (Compute Exchange GPU directory, 6 October 2026); on-demand in EU regions from $1.30 per GPU-hour (GPU Finder, 6 October 2026). These are indicative USD figures, not quotes. Your price depends on term, cluster size, interconnect and location, and Kraftcompute quotes come from providers directly, in EUR.
Should I rent H100 on-demand or reserved?
On-demand capacity has no commitment: you start and stop when you like, and pay for the hours you use. Reserved capacity commits you to a term (1 to 36 months in our form) and usually comes with a lower hourly rate and guaranteed access for that term.
Can I keep H100 workloads in the EU?
Yes. In the quote form, choose EU-only data centres, specific countries, or EU-headquartered providers. We only ask providers who can meet the rule, and every H100 quote shows the location.
How many H100s can I rent?
Anything from a single GPU to large clusters. Enter the number of GPUs in the form; multi-node clusters are usually built from 8-GPU nodes, and you can state the interconnect you need (InfiniBand or RoCE).
Need NVIDIA H100 capacity?
Tell us count, region and term. Competing quotes from vetted European providers, targeted within 48 hours.