Powered sites for GPU clouds
We're building a network that matches data-centre developers that have grid-connected land or powered shells with GPU clouds that need megawatts, across the Nordics, Poland and Iberia.
For site owners
When you register a site, we'll ask for:
- MW available and the energisation date
- Power price and power source
- Design PUE
- Permits in place
- Connectivity
For GPU clouds
Tell us how many MW you need, when, and your latency and cooling requirements. We'll come back with sites that fit.
Why now
Grid capacity is scarce. In March 2026 Denmark's transmission operator, Energinet, paused new grid-connection agreements for three months, citing very large new loads, particularly data centres, batteries and Power-to-X plants (Energinet, 4 March 2026). In May it said that after the pause ended on 3 June, larger projects would be handled together in batches under stricter requirements for maturity, and that no new connection agreements would be signed before the autumn. Projects that already have a connection agreement are not covered by the new model (Energinet, 27 May 2026; as of 18 November 2026).
Regulatory
Data centres of 500 kW or more have reporting duties under the Energy Efficiency Directive (EU) 2023/1791, Art. 12 (EUR-Lex). Our site files include this information.
Register interest
Talk to a person
30 minutes with Peter Hjortsø, Managing Director. No sales script: powered sites, MW and timing.